ORGANIZATION of PASSING EXTRACTION of VALUABLE COMPONENTS AT the ACTING PLANTS PROCESSING SANDY-GRAVELLY MATERIAL

 

Purpose of the design

Production and realization of commodity concentrates, semifinished items and finished products (titania, zirconium concentrate, gold, ferruginous pigments, antirust coatings, abrasive powders, glass sands etc.) at the expense of passing production and subsequent processing of valuable components at the acting plants processing sandy-gravelly mixtures (SGM).

 

Description of the design

In the central region of Russia by the results of numerous studies, in composition practically of all SGM deposits there are valuable and scarce components using in national economy and being of commercial interest.

As a rule these passing components, are containing in fine, sandy fraction and during SGM exploitation at clearing rivers’ fairways (the displaced(migrated) sandy masses) go off in dumps.

As all expenses on processing and transportation of mining mass rock have already been included in cost of the basic output of the acting plant, the cost of passing production of useful components becomes maximum low in comparison with their output from traditional deposits. Therefore planned production is highly profitable.

All-Russian scientific-research institute of mineral resources named after N.M.Fedorovsky (VIMS), its industrial plant «GeotechVIMS» and «Konverszoloto» had worked out complete technological cycle of passing extraction of valuable components of commercial interest, at mining dressing integrated works,open cut managements, suction-tube dredgers, exploiting SGM deposits, without violation of technological condition of acting production.

Plants with wet cycle of dressing (output more than 200 thousand m3 of sand (tailings) a year are of industrial interest Only on the territory of the European part of Russia there are known dozens of similar acting MDP,quarries and suction-tube dredgers. On the Kama, the Oka, the Vyatka, the Volga rivers millions of m3 of bottomset sandy beds are annually moved when clearing the fairways.

Development works and preliminary accounts on one of the objects of Tatarstan republic demonstrate, that when annual SGM processing is 700 thousand m3 the profit from the sale of passing produced commodity products is not less than 700-800 thousand US dollars (including realization of 55-60 kg of gold). The expenses for organization of by production are compensated within 5-6 months.

 

Realization of the design

Three stages of design’s realization are planed:

1. Selection and estimation of SGM perspective objects under passing mining;

2. Commercial tests for equipment’s adaptation machinery in real production, compiling the technological rules and production certificate production prototypes of commercial products;

3. Designing, installation and start of production for passing recovery of useful components on annual bulk of a current mining of the basic production.

The basic consumers of final goods are varnished-dye factories (titanium white paint, ferruginous pigments, glauconite), metallurgical and electrotechnical factories (magnetite and zirconium concentrates, abrasive powders), glass works (quartz sand), refineries (gold concentrate) etc.

Indispensable investments (from 200 thousand up to 1 million. US dollars) depending on object of SGM processing.

Payback time- 1-1.5 years.

 

Investor’s forms of participation

Creation the joint company with investor’s share in the authorized capital from (30 %).

 

The coordinators of the design:

Vladimir V. Korotkov

Tel. (095) 951 19 07

Fax. (095) 959 34 47

E-mail: vims@df.ru

Kliment V. Yablokov

Tel. (095) 943-30-23

Fax (095) 943-13-06